Please use this identifier to cite or link to this item: http://210.212.227.212:8080/xmlui/handle/123456789/165
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFiza, Fathima-
dc.contributor.authorAnu, Thomas V-
dc.date.accessioned2022-09-24T10:38:08Z-
dc.date.available2022-09-24T10:38:08Z-
dc.date.issued2022-07-06-
dc.identifier.urihttp://210.212.227.212:8080/xmlui/handle/123456789/165-
dc.description.abstractMultiple-Criteria Decision Analysis techniques are utilized for prioritizing, finding the stakeholder perception of the risk factors and determining the interrelationship between the main risk heads in PPP projects. Risk remedial measures are identified to mitigate the risks in PPP projects. The risk factors are modelled in Partial Least Square Structural Equation Modelling (PLS-SEM) to find their impact on PPP project performance. The study concluded that social, legal, financial and construction risks have a significant negative impact on project performance. The effects of social and legal risks on economic risk and political risk on financial risk are also significant.en_US
dc.language.isoenen_US
dc.relation.ispartofseries;TKM20CESC11-
dc.subjectPartial Least Square Structural Equation Modelling (PLS-SEM)en_US
dc.subjectPublic Private Partnership Projectsen_US
dc.subjectRisk Managementen_US
dc.subjectRisk Remedial Measuresen_US
dc.titleDEVELOPMENT OF RISK ANALYSIS MODEL IN PUBLIC PRIVATE PARTNERSHIP PROJECTSen_US
dc.typeTechnical Reporten_US
Appears in Collections:2022

Files in This Item:
File Description SizeFormat 
FIZA FATHIMA TKM20CESC11 M. Tech thesis.pdf5.78 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.